• Prepared Capital Financing to 2105 and Developed User Rates for a Water System and Two Wastewater Systems utilizing the long range capital plan developed by an Engineer Team Member Township of Clearview
  • Prepared Water and Wastewater Rates and Financial Plan for the City of Orillia based on a Capital Plan to 2030 developed by an Engineer team member
  • Created a Financing plan to 2039, Developed Rates and Prepared a Financial Plan for the local Water System and Two Wastewater Systems Municipality of West Elgin
  • Developed a Financing Plan to 2039 for the West Elgin Regional Water System, Prepared Rates and Formulated a Financial Plan Municipality of West Elgin
  • Prepared Water and Wastewater Rates and a Financial Plan for the Township of Black River-Matheson based on a Capital Plan with a 35-year horizon developed by an Engineer team member
  • Established Financial Plan Covering Capital Renewal to 2044, Developed Water/Wastewater Rates and Prepared a Financial Plan Municipality of Powassan
  • Prepared a Capital Financing Plan to 2039, Formulated Water and Wastewater Rates and 30 year Financial Plan for the Township South Perth based on a the long term Capital Plan developed by an Engineer team member
  • Developed a Capital Financing Plan and Prepared Full Cost Water/Wastewater Town of Penetanguishene
  • Compiled Capital Renewal Needs Projection to 2045, Developed a Capital Financing Plan to 2045, Prepared Water and Wastewater Rates and Formulated a Financial Plan for the Township of Cramahe
  • Prepared a 10-year Horizon Capital Renewal Plan, Full Cost Water and Wastewater Rates for Two Separate Systems. Township of North Dundas
  • Established Full Cost Rates Consistent with Bill 175, the Sustainable Water and Sewer Systems Act with a 20 year Horizon for Water and Wastewater Township of Essa
  • Full Cost Pricing Report/Water and Wastewater Rates Development Township of Madawaska Valley
  • Developed New Water and Wastewater Rates for a Recently Metered System Town of Penetanguishene (2005)
  • Rate Development 31 individual rates and one common rate City of Kawartha Lakes
  • Connection Fee Development City of Kawartha Lakes
  • Development of New User Pay Water/Wastewater Rates and Rate By Law Municipality of Brockton
  • Flat Rate Development for Water and Sewer Town of Penetanguishene (2002)
  • Development of Metered User Pay Rates and Rate By Law Township of Essa
  • Rate Development and Meter Public Information Campaign Town of Saugeen Shores
  • New Simplified Water and Wastewater Rate Development Village of Bobcaygeon
  • Prepared Business Case Assessment of Water Meter Installation and two Water Efficiency Options with an Engineer Peterborough Utilities Commission
  • Developed the Water Conservation Course and Act as Instructor for the Walkerton Clean Water Centre
  • Water Efficiency Program Development for South Woodslea Town of Lakeshore
  • Water Efficiency Study Project Management Russell Township
  • Water Efficiency Study Component of Class EA Municipality of Brockton
  • Water Efficiency Component of Water Supply Class EA City of North Bay
  • Water Efficiency Program Business Case City of Barrie
  • Comprehensive Water Efficiency Plan Development and Implementation Union Water System
  • School Children Water Efficiency Education Program Project Management OCWA and the OMWA
  • Water Efficiency and Downspout Disconnection Brochures Ontario Clean Water Agency
  • Public Information Brochures on Five Water Treatment Devices – Canada Mortgage and Housing Corp.
  • Assessment of Private Communal Residential Water Systems in Ontario (with an engineering firm) – Ministry of the Environment
  • Audit Guide for Industrial and Commercial Users – Project Management – Ministry of Energy;
  • Greenhouse and Major User Water Use Analysis and Action Plan Development – Union Water System
  • Water Meter Information and Options Report – Township of Northern Bruce Peninsula
  • Water Meter Installation Project Management and Lion's Head Rate Setting – Township of Northern Bruce Peninsula
  • Water Meter Installation Project Management – Town of NE Manitoulin and the Islands
  • Water Meter Reader Route Ordering – Town of Wasaga Beach
  • Meter Installation and Rate Setting Project Management and Program Evaluation – Village of Fenelon Falls
  • Member of a Task Group that Developed a National Water Efficiency Strategy Statement – Canadian Council of the Ministers of Environment
  • Carried out Municipal Water Efficiency Survey and Database Upgrade Environment Canada